Weekly contractor control: 7 indicators
Schedule, actual quantities, labour and equipment, supervision comments, as-built documentation, advances and accumulated changes — one weekly table shows where delivery starts to drift.
Read the original post →
LinkedIn · CAPEX
Where a residential project budget leaks
Five common loss areas: land and planning potential, design decisions, contracting, site changes and schedule. The later a variance is found, the more expensive it is to correct.
Read the original post →
LinkedIn · stage-gate
How to stop making project decisions by intuition
Five gates from project entry to commissioning readiness help test economics, documentation and risk while decisions are still inexpensive to change.
Read the original post →
LinkedIn · case study
When a purchased project is barely viable
A case of reassessing the product and design: façades, layouts, social infrastructure, utilities and landscaping. The result was a RUB 400m CAPEX reduction in 2024–2025.
Read the original post →
LinkedIn · diagnostics
5 signs a project is moving into deficit
Early warning signs appear in budget absorption versus physical progress, the pace of change orders and the remaining contingency.
Read the original post →
LinkedIn · practice
When a project needs an independent view
Project diagnostics, CAPEX optimisation, deficit recovery and PMO setup are areas where warning signs often appear months before a crisis.
Read the original post →
LinkedIn · website launch
What an express project audit gives the client
Schedule and critical path, budget and CAPEX, contracts, risk register, IRR/NPV sensitivity and a concrete 30-day action plan.
Read the original post →
CEOWORLD Magazine
How Developers Can Stop Early Decisions from Becoming Major Overruns
A whole-project review connects the live financial model, total project cost and contractor capability before contract award. One case cut the forecast budget by 7–9%.
Read the article →