Residential project audit · Northwest Russia

Independent audit of residential development projects — before funding decisions and when schedule or CAPEX slips

I am Marian Krotov, with 19 years on the client side of real estate development. I review residential projects in Northwest Russia at decision gates: before funding decisions and when schedule or CAPEX moves off plan. In 7 working days, you get an independent assessment, a risk map and a 30-day action plan. The first conversation is free and takes 30 minutes; no documents are needed.

  • Residential projects · Northwest Russia
  • Reach me on Telegram or e-mail
  • Work under NDA
  • Standalone consultation — fee agreed individually

Diagnostic method

Stage-gate review: is the project ready for its next decision?

At transitions between phases, I compare the original decisions with current data and risks. This shows not only today's variance, but its impact on funding, schedule and budget.

01

Investment case

Land, core assumptions, project economics and the conditions under which the project still makes sense.

02

Preparation and design

Permits, completeness of inputs, readiness of decisions and the effect of changes on schedule and CAPEX.

03

Tenders and construction

Contracts, commitments, critical path, scope changes and estimate to complete.

04

Commissioning and handover

Readiness to complete, remaining works, open risks and decisions required for handover.

01 — About me

I stand on the client side — and I know where money leaks out of a project

Head of construction and investment-construction projects. 19 years in the industry: from a technical supervision engineer in 2007 to a project director with my own general contractor.

The last seven years — managing full-cycle development projects on the client side: budget and CAPEX, development schedule, P&L and financial model, tenders and contracts, the team and 30+ contractor organisations, approvals and commissioning.

Since September 2026 — an independent expert consultant. I work with developers and investors who need an honest view of the project: where schedule and budget slip, where money is being lost and what to change in the first 30 days. I do not run the project — I show where it is losing control and hand you an action plan.

As an independent consultant I work on a single problem — within 7 working days, show where the project is actually losing money and missing deadlines, and what can be changed immediately. No presentations for the sake of presentations: numbers, variances and concrete decisions.

  • Full-cycle project managementFrom pre-design preparation and the planning permit to the commissioning permit and key handover
  • CAPEX, P&L, IRR and NPVProject budget, cash flow, escrow accounts and project financing
  • Tenders and contract strategyContractor concentration, price benchmarks, contract risks
  • Development scheduleCritical path, credibility of the completion date, stage control
  • Risks and mitigationA risk register with owners, deadlines and a 30-day plan
  • Client-side teamHiring, roles, contractor incentives and coordination of 30+ organisations

02 — Results

What is backed by numbers, not by promises

RUB 17bn+

budget of the «Novy Moskovsky» project (FSK Severo-Zapad) under my management

  • 128,000 m² of sellable residential area, 6 phases
  • 30+ contractor organisations coordinated
  • 6 projects running simultaneously
CAPEX optimisation «Life-Lesnaya» project, Pioner
Forecast before
100%
After optimisation
92%

A 7–9% cut in the forecast construction budget with no loss of the project's quality parameters

Phase 1 «Novy Moskovsky» 84,130 m² · 4 buildings
Approved budget
100%
Actual
< 3%

Variance against the approved budget — under 3%. The phase was commissioned within budget, the commissioning permit was granted in December 2025

03 — Service

Independent audit of a residential development project

An independent view of the schedule, budget and contracts in 7 working days.

What is included

01

Schedule

Critical path, deviations from the baseline plan, credibility of the completion date.

02

Budget and CAPEX

Plan and actual, forecast to completion, areas of potential savings.

03

Contracts and tenders

Contract terms, contractor concentration, price benchmarks.

04

Risks

A register of 10–15 priority risks with mitigation measures and owners.

05

Project economics

IRR and NPV sensitivity to cost growth, schedule and sales.

06

Deliverables

An 8–12 page report, a 30-day action plan and a 60-minute review with management.

04 — How the work runs

Seven working days from documents to a review with management

← Swipe the chart sideways →

  1. Day 1

    Documents received

    Schedule, budget, key contracts, the latest management report.

  2. Days 2–3

    Interviews

    One or two project leaders, clarifying the inputs and the contradictions in the numbers.

  3. Days 3–6

    Analysis

    Schedule, budget, contracts and risks; a sensitivity analysis of the project economics.

  4. Day 7

    Handover of the report

    The report and the 30-day plan, followed by a 60-minute review with management.

05 — Fees and terms

Formats and engagement terms

After the audit

Project support and recovery

Fee by agreement

After the audit, I can support the agreed action plan or help restore control when schedule, CAPEX or project decisions have drifted. Scope, duration and fee are agreed separately.

  • Track actions and decision gates after the audit
  • Reset schedule, CAPEX forecast and risk priorities
  • Support the project team through an agreed recovery plan
Write and talk it through

Not included in the audit

  • Technical expertise on structures
  • Legal opinion
  • Valuation of the asset
  • Running the project

The audit provides an assessment and recommendations based on the documents provided; the outcome (including any savings) is not guaranteed and depends on the client's decisions.

06 — Experience

19 years: from technical supervision engineer to independent expert

  1. Sep 2026 — present

    Independent expert consultant — for investment and construction projects

    Working with developers and investors: express project audits, review of the schedule, CAPEX and the contract base, risk registers, IRR and NPV sensitivity. An independent view from the client's side — without running the project.

  2. Feb 2024 — Sep 2026

    FSK Severo-Zapad — project director

    Development on the client side, with our own general contractor. The «Novy Moskovsky» residential quarter (128,000 m², budget over RUB 17bn) and the premium club house «Novgorodskaya 8» (25,174 m²). Managing the team, coordinating 30+ contractor organisations, CAPEX, P&L, IRR/NPV, approvals and commissioning.

  3. Apr 2019 — Feb 2024

    Pioner, group of companies — head of projects

    Client-side projects with budgets of up to RUB 17bn+: the «Life-Lesnaya» residential complex (147,000 m²), the «Yes» aparthotel (73,266 m²), the «Life-Varshavskaya» residential complex (81,181 and 100,463 m²). Managing the financial model, CAPEX optimisation of 7–9%, launching construction with no shift in the investment schedule.

  4. 2017 — 2019

    Normann investment and construction group — technical supervision engineer

    Client-side service: schedule and construction quality control, acceptance of volumes, work with regulatory bodies. The «Tri Apelsina» residential complex, phase 2; the «Desyatkino» residential complex, phase 1.

  5. 2015 — 2017

    CDS, Stroy-Resurs (O2 Development), SK Anker — engineer / lead technical supervision engineer

    The «Murinsky Posad» residential complex, the «Sili Prirody» residential complex, the «Kamenka» and «Novaya Kamenka» residential quarters (77,598 m², 9 buildings). Technical supervision, volumes, acceptance, commissioning.

  6. 2012 — 2015

    SU-155, group of companies — technical supervision inspector

    A social housing quarter (2 kindergartens, 2 schools, parkings and utilities), the «Yanino-Park» residential complex (58,216 m²), a Kalininsky District ice arena, capital repairs of a hospital.

  7. 2007 — 2012

    SK StroyProfKompleks, NPO «RAND», Lenstroytrest — technical supervision engineer / technician

    Career start: project estimates, checking volumes against the drawings, tender specifications, technical supervision of the reconstruction of the Architectural and Construction College.

Questions about the audit

Development project audit: questions and answers

Scope, documents, timing and engagement terms.

What does a development project audit include?

A review of the development schedule and critical path, the budget and CAPEX, contracts and tenders, the risk register and IRR/NPV sensitivity. You get an 8–12 page report, a 30-day action plan and a 60-minute review with management.

When does a developer or investor need an independent audit?

When you need to verify the numbers produced by the project team, understand schedule and budget variances, or assess a project before acquiring or financing it. An audit also helps when the contractor, general contractor or financial model changes.

Which documents are needed and how long does the express audit take?

The free 30-minute introductory call needs no documents. If we agree an audit is useful, the review starts after scope, NDA and the document list are agreed. It takes 7 working days from receipt of the agreed materials and includes interviews with one or two project leads.

How much does an investment and construction project audit cost?

The express audit starts at RUB 250,000. The fee is fixed in RUB after the project scope is agreed, before work starts. The price of a standalone consultation and of regular ongoing support is agreed individually.

Can I order an audit for a project in another region?

The focus is residential development projects in Northwest Russia. Remote work elsewhere may be considered after a 30-minute call, depending on the project phase and available information. The first conversation is free; no documents are needed.

Start here

Free 30-minute introductory call

We will discuss the situation and the next decision facing the project. No documents are needed.

Report structure preview

Know what the deliverable looks like

  • Decision gate and the decision to be made
  • Plan vs. actual for schedule, CAPEX and key contracts
  • Cause of the variance and its risk to the next phase
  • Action, owner and due date for the next 30 days

The sample shows the report structure and reasoning using illustrative data; it is not a client case. An NDA and an agreed list of materials come before the document-based audit.

View the sample report in English View the sample report in Russian

A remote audit assesses supplied information and interviews. It does not verify the physical condition of the site or replace a technical inspection or construction supervision. If a conclusion depends on an on-site inspection, that limitation is stated before scope is agreed.

08 — Contact

Let’s talk about your project

Tell me what is happening with the project and what exactly you want checked. The preferred way to reach me is Telegram. I reply personally, on business days.

Website inquiry

Briefly tell me about your project

Responses are stored in Yandex Forms.

Open the form separately · Personal data notice